BIG Kaiser Higher Precision Guaranteed
View the site en Espaņol
Search the site:
 
News & Events >> Technical Articles and Case Studies

Technical Articles and Case Studies

The links below provide valuable insight into technical information, processes & solutions utilizing BIG Kaiser products. Please contact the BIG Kaiser Marketing Department for further information regarding any topic you see here.


BIG Kaiser and BIG Daishowa Seiki Warn of
Potential Spindle Damage from Unlicensed BIG-PLUS® Tooling


2014

12/14 - Finish Boring Tools That "Just Work"

10/14 - Put Your Workpiece on a Pedestal (5-Axis Mod. Workholding)

10/14 - Tooling: Fine Details for High Production Standards

10/14 - Cornering the Market on Suspension Innovation

10/14 - BIG Kaiser & Gearench - Achieving First Part Precision

9/14 - In Aerospace Boring, It's All About the Tool

9/14 - Digital Tooling Improves Accuracy, Reduces Scrap

8/14 - Let Your TMS and Machine Tools Talk Amongst Themselves

8/14 - Spindle Speeders Allow Micromachining on Lower-rpm Machines

7/14 - When is a Spindle Speeder Right for You?

5/14 - BC Instruments Takes Advantage Of Sphinx Micro Drills

3/14 - Focus on the Workforce

1/14 - Turning Heads with Presetters

1/14 - What's Best for Boring Titanium?

2013

9/13 - The Benefits and Limitations of Machining with Angle Heads

6/13 - Tool Time for Fracking

5/13 - Evolving Toward Digital

4/13 - Putting Global Change into Perspective

2012

12/12 - Andretti Autosport Finds Shared DNA, Culture with BIG Kaiser

12/12 - Rigidity Proves Key to Precision Boring

12/12 - When Reshoring Really Happens

10/12 - Small Drills with a Big Bite

9/12 - Boring is Exciting at Pilatus Aircraft

9/12 - Fixing the Hole Problem

8/12 - Get It Right the First Time, Every Time

7/12 - Avoiding Holding Penalties

5/12 - Big and Bigger

5/12 - Speedy Alignment

4/12 - Small Parts, Smaller Features

3/12 - Oil Field Goods

2/12 - Beat Vibration

1/12 - Using Tool Presetters for Inspection

2011

12/11 - Set, Ready, Go

10/11 - Tools Optimize Process and Part Quality

9/11 - Heavy Traffic - High-Density Workholding Can Squeeze...

5/11 - Head Start - Adjustable Finish Boring Heads Allow...

5/11 - Making Perfect Holes

4/11 - New BIG Kaiser Boring System Rewrites The Rules

3/11 - The Refinement of Microdrilling

3/11 - Speroni Tool Presetter Benefits Ejector Seat Manufacturer

3/11 - Air Power Spindle Used for Abrasive Aerospace Composites

2/11 - Advanced Workholding for Energy

1/11 - Presetting Pays Dividends


2010

12/10 - Presetting Plus

9/10 - Increasing Production Through Setup Reduction (Video)

9/10 - Presetting Process Cuts Scrap Rework

9/10 - Accessories in Action

7/10 - Riding Herd on Runout

4/10 - Holding Firm

4/10 - Fit the Job - Tools Smaller Than a Hair

3/10 - Machining Small Parts


2009


12/09 - Rounding Up the Usual Suspects

07/09 - Invest Intelligently to Improve Productivity

07/09 - Reducing Thrust Loads During Rigid Tapping

06/09 - Workholding for Fast Changeovers

04/09 - 60 Years for KAISER AG

04/09 - TLC for Toolholder Assemblies

04/09 - Micro-Drilling: Some Questions to Think About

03/09 - How to Guarantee Success

03/09 - Reducing Fixturing Costs with Magnets

03/09 - Custom Tools From Standard Components

01/09 - Cutting It's Own Path

2008

03/08 - Indexable Endmill with Integral BIG-PLUSŪ Shank ....

2007

10/07 - Aerospace Specialists Rely on KAISER Boring

08/07 - Mega Double Power Chuck Delivers Higher Cutting ....

07/07 - Modern Machine Shop: A Practical Guide To Presetters

06/07 - Moldmaking Technology: Accessorize Your Machine to Maximize ....

05/07 - Modern Machine Shop: Boosting Machine Spindle Speed For ....

2006

11/06 - Manufacturing Engineering: Presetting Expands Toolroom Capacity

09/06 - ShopTalk: Quick-change Manufacturing: Every time you touch it ....

09/06 - Tooling & Production: Boring-rod Technique Ensures Prime ....

08/06 - Moldmaking Technology: Toolroom Management: Presetting ....

07/06 - Modern Machine Shop: The Real Cost of Runout

06/06 - Production Machining: Increase Production With Setup Reduction

06/06 - 30-45 Minutes Per Setup Eliminated After Switching ....

04/06 - Scrap Rate Drops from 50% to 1.5% with BIG ....

01/06 - Manufacturing Engineering: Tooling Gives Racing Team ....

 

2005

12/05 - Toolholder Balance in Practice

 

2004

04/04 - Increase Production With Setup Reduction

 

2003

02/03 - Four-Hour Job Cut To Twenty Minutes

02/03 - Wisconsin Manufacturer Solves Boring Problem

 

2002

09/02 - Reduces a 21-Minute Job To 9 Minutes

07/02 - A Boring Solution

06/02 - High Speed Balance

 

2000

06/00 - Double Header

 

1998

05/98 - Boring in the Fast Lane

01/98 - Setting Tools Makes Small Shop Sense

 

1996

08/96 - Presetter Produce Profit

 

1995

02/95 - Switch Drills?

 

1994

06/94 - Tips For Better Boring

BIG Kaiser Technical Articles & Case Studies